GSI ABUTMENTS
New Zealand has one of the highest bridge densities per kilometre of road in the world, a consequence of the country's highly dissected terrain, numerous river crossings, and extensive rural road network. Many of these bridges were constructed in timber or early concrete in the mid-twentieth century, and their abutments are deteriorating. Timber piles are rotting. Concrete is cracking and spalling. Masonry is eroding. The conventional response — demolish and rebuild — is expensive, slow, and in sensitive environments may require resource consent that extends the project timeline significantly.
GSIAbutments™ is GSI's proprietary in-place bridge abutment rehabilitation system. Rather than removing the existing abutment, we reinforce and rehabilitate it from the outside — inserting new structural capacity through the existing face without demolition. This approach keeps the existing bridge deck in service during construction in most cases, reduces closure time from weeks to days, and cuts cost significantly compared to full reconstruction.
SUITED TO
- —Timber, concrete and steel abutments experiencing settlement or scour
- —Weight-restricted bridges requiring load capacity upgrade
- —Structures where full closure is operationally unacceptable
- —Heritage bridges where demolition is undesirable
GSI NZ CAPABILITY
- —SuperNails™ and micropile installation through existing structure without demolition
- —Closures measured in days not weeks
- —Same team as GSIBRIDGE™ for replacement when rehabilitation is not feasible
- —Registered engineers, full QA on completion