HEB Construction engaged Geostabilization New Zealand Ltd at the project’s initial stages. During this phase, GeoStabilization provided site sampling, laboratory testing, and physical trial panels. These tasks were required ahead of the main works program to ensure the right mix design and binder applications were applied to Rotorua Lakefront’s sensitive soils.