Barry Cunningham – Hiways Slope Stabilisation and Anchoring manager talks to Geodrilling International.
Read the full article at GeoInt-Slope-Stabilisation-Apr-16.pdf
Geostabilization New Zealand Ltd (GeoStabilization NZ) was engaged by Connell Contractors following issues with traditional sheet pile and dewatering techniques for the drainage pipe installation as part of the replacement Hamilton Western Interceptor. This project forms part of the local council’s $2B, 10-year resilience and future growth program to improve the city’s infrastructure.